Timeline

2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
Jan. '14CompletedNov. '17

Implementing Partners

Groupe ADP
Leader: Groupe ADP

Description

This Implementation Project, successfully deployed by Aéroports de Paris, aimed at enhancing the local Airport Collaborative Decision Making (A-CDM) in operations at Paris - Charles De Gaulle (CDG) international airport. The A-CDM is an airport operational procedure aimed at improving the management and performance of departing and arriving flights through an improved and stronger exchange of information between the stakeholders (e.g. airport operators, Air Traffic Control, Ground handlers, Airlines, Network Manager). The procedure is mainly focused on aircraft pre-departure and turn-round processes.

This specific IP was focused on the optimization and enhancements of the following A-CDM features:

  • Enhancement of the Pre-departure sequencer (PDS) to make the Target Start Approval Time (TSAT), i.e. the time at which ATC provides the clearance to an aircraft to move from its departure stand, more stable especially in adverse conditions (e.g. thunderstorms, snow, etc.);

  • Improvement of the automatic messages exchanged by the local airport with the Network Manager Operations Centre (NMOC) to provide the Network Manager with the most updated and reliable information concerning the airport movements with the objective to optimise the air traffic management at network level;

  • Improvement of de-icing tools supporting the A-CDM procedure optimising the holding points as well as the de-icing pads management, better estimating the impacts on the pre-departure sequence and Target Take-off Times (TTOT) of the departing flights.

The implementation of this project, in conjunction with complementary A-CDM projects at CDG airport (specifically IP #025AF2 – TSAT to the gate and #027AF2 – Surface Management (SMAN) airport) brought tangible benefits, such as:

  • 391.000 minutes of ATC delay reduction and 746.000 minutes of Taxi-out time reduction, equating to 38M€ in savings up to 2030;

  • Additional qualitative benefits

    • Better resource management of stands

    • Better optimisation of the turnaround process

    • Improved Arrival and Departure punctuality

Disclaimer

A certain number of completed projects are highlighted as it was already possible to provide detailed information on specific benefits brought by these projects. In time, SESAR Deployment Manager will provide such detailed information for every completed project.

Countries involved

Additional Information

  • Project Type: Airport
  • CEF Call Year: 2014
  • Civil/Military: Civil
  • Multistakeholder: No
  • Main AF: AF2 - Airport Integration and Throughput
  • Sub AF: S-AF 2.1 Departure Management Synchronised with Pre-departure sequencing
  • Progress Percentage: 100%

News & Events

niklas-jonasson-N8 JqFhBr4M-unsplash
Featured News
How Europe’s Air Traffic Management transformation started
08.10.2026Read more
SESAR Delivers part 2
Featured News
#SESARDELIVERS: from innovation to deployment
22.09.2026Read more
ACI leaflet news
Featured News
ACI Europe and SDM showcase the airports’ commitment to modernise European ATM
17.09.2026Read more
tsuyoshi-kozu-jnMFfL2lSsE-unsplash
Featured Event
AF6+ Coordination Platform 4th Meeting
04.11.2026Read more
Beeld Delivering Impact
Featured Event
-DELIVERING IMPACT- a SESAR Deployment Manager Event
19.11.2026Read more
events-april-2024 1600x500-min
Featured Event
Managing Significant Change in European ATM: Social Dialogue, Technology and People
16.12.2026Read more
IRIS 2
Featured Event
Workshop: 'datalink services enabling ATM efficiency: the role of Iris and multilink'
27.01.2027Read more
SDM AAN EDA
Event
Civil-Military SWIM Symposium
30.09.2026Read more

Subscribe now

Please complete and submit the form below to be subscribed to ‘News and views from the SESAR Deployment Manager’.
You will receive a verification email before you are added to our subscriber list.