Time-Based Separation at Heathrow Airport

Timeline

2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
Jan. '14CompletedFeb. '16

Implementing Partners

Heathrow Airport
Leader: Heathrow Airport
British Airways
Contributor: British Airways
NATS
Contributor: NATS

Description

Time-Based Separation (TBS), deployed by Heathrow Airport, NATS and British Airways, is in operation and delivering benefits at Heathrow Airport since March 2015. Heathrow TBS was the first world’s TBS system to be implemented and paved the way for TBS to become the norm at capacity-constrained airfields.

By 2030, this implementation is expected to save almost 100.000 minutes of flight time and 23.000 tons of fuel. These elements equate to 55 million euros of monetised benefits by that date.

Under the previous final approach system of fixed-distance separation, aircraft groundspeed dropped when headwinds increased, reducing the landing rate – which in turn led to extended airborne holding and increased delays. Time-Based Separation dynamically adjusts the separation between arrivals, maintaining the time separation between aircraft at a constant equivalent to the distance separation in order to safely reduce the approach separation recovering most of the capacity otherwise lost during strong headwind conditions.

TBS operates in all wind conditions, reducing separation between arrivals in strong headwinds and slightly increasing separation in still or tailwind conditions.

The next phase of the TBS evolution is to enhance the current Heathrow TBS system so it provides controllers with tool support to deliver more efficient wake separations, enabling more rapid recovery from adverse conditions, helping to reduce the overall delay for arrival and departure operations and mitigating the increasing use of heavier aircraft types

Disclaimer

A certain number of completed projects are highlighted as it was already possible to provide detailed information on specific benefits brought by these projects. In time, SESAR Deployment Manager will provide such detailed information for every completed project.

Countries involved

Additional Information

  • Project Type: Airport
  • CEF Call Year: 2014
  • Civil/Military: Civil
  • Multistakeholder: Yes
  • Main AF: AF2 - Airport Integration and Throughput
  • Sub AF: S-AF 2.3 Time Based Separation for Final Approach
  • Progress Percentage: 100%

News & Events

asone1-990000079e04513c
Featured News
News and views of SESAR Deployment Manager #1/2026
10.03.2026Read more
Europe+for+Aviation+-+enews+banner+2026
Featured News
Europe for Aviation Join Forces at Airspace World 2026
02.03.2026Read more
SDIP Declaration
Featured News
Proud moment for European Air Traffic Management modernisation
01.10.2025Read more
Europe+for+Aviation+-+enews+banner+2026
Featured Event
Europe for Aviation Join Forces at Airspace World 2026
26.05.2026Read more
2026 Interim Payment Webinar
Event
2026 Interim Payment Webinar
21.01.2026Read more
bannerSWT2026-9900000000079e3c
News
Register until 20 February for the SESAR Walking Tours & Apply for the Seamless Skies Awards
13.01.2026Read more
headpicture1-9ba2c11598655ac7
News
Look Back at 2025
01.01.2026Read more
glenn-carstens-peters-npxXWgQ33ZQ-unsplash
Event
CEF 2 Report Training
11.12.2025Read more

Subscribe now

Please complete and submit the form below to be subscribed to ‘News and views from the SESAR Deployment Manager’.
You will receive a verification email before you are added to our subscriber list.