2015_133_AF2

Initial AirPort Operational Centre (iAPOC)

Timeline

2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
Mar. '16CompletedDec. '19

Implementing Partners

Groupe ADP
Leader: Groupe ADP
DSNA
Contributor: DSNA
Air France
Contributor: Air France

Disclaimer

Description

The Initial Airport Operational Centre (iAPOC), deployed by Aeroports de Paris, DSNA and Air France, is operational in Orly airport since December 2019. The APOC is a unified control room responsible for planning, controlling and monitoring the airport operations.

The main purpose is to bring all key airport stakeholders together in an operational room having a complete and seamless overview on all the airport operations (both landside and airside) from different planning and monitoring perspectives (i.e. at strategic, tactical, execution and post operations level). The APOC dramatically improves the Collaborative Decision Making (CDM), especially in those situations in which a faster recovery from degraded operational performance is pivotal (e.g. meteorological adverse conditions).

Within the APOC, the involved Stakeholders maintain a joint plan – the Airport Operations Plan (AOP) which is a single, common and collaboratively agreed rolling plan available to all airport stakeholders whose purpose is to enable an in-depth information sharing to achieve the most advanced common situational awareness and to form the basis upon which stakeholder decisions relating to process optimisation can be made.

The APOC is equipped with advanced IT tools to perform what-if and post operational analysis with the objective to define, evaluate and optimise different operational scenarios for both nominal and adverse conditions.

It is worth noting that the successful implementation of the initial APOC at Orly airport represents the foundation of the future APOC in which the most advanced tools and decision-making processes will be implemented.

The implementation of this project is bringing tangible benefits resulting in the reduction of both ATC delay and taxi-out time. Moreover, the overall airport capacity increases thanks to the improvements in terms of operational efficiency. These improvements translate in savings of 75 Million Euros until 2030.

Disclaimer

A certain number of completed projects are highlighted as it was already possible to provide detailed information on specific benefits brought by these projects. In time, SESAR Deployment Manager will provide such detailed information for every completed project.

Countries involved

Additional Information

  • Project Type: Airport
  • CEF Call Year: 2015
  • Civil/Military: Civil
  • Multistakeholder: Yes
  • Main AF: AF2 - Airport Integration and Throughput
  • Sub AF: S-AF 2.1 Departure Management Synchronised with Pre-departure sequencing
  • Progress Percentage: 100%

News & Events

niklas-jonasson-N8 JqFhBr4M-unsplash
Featured News
How Europe’s Air Traffic Management transformation started
08.10.2026Read more
SESAR Delivers part 2
Featured News
#SESARDELIVERS: from innovation to deployment
22.09.2026Read more
ACI leaflet news
Featured News
ACI Europe and SDM showcase the airports’ commitment to modernise European ATM
17.09.2026Read more
tsuyoshi-kozu-jnMFfL2lSsE-unsplash
Featured Event
AF6+ Coordination Platform 4th Meeting
04.11.2026Read more
Beeld Delivering Impact
Featured Event
-DELIVERING IMPACT- a SESAR Deployment Manager Event
19.11.2026Read more
events-april-2024 1600x500-min
Featured Event
Managing Significant Change in European ATM: Social Dialogue, Technology and People
16.12.2026Read more
IRIS 2
Featured Event
Workshop: 'datalink services enabling ATM efficiency: the role of Iris and multilink'
27.01.2027Read more
SDM AAN EDA
Event
Civil-Military SWIM Symposium
30.09.2026Read more

Subscribe now

Please complete and submit the form below to be subscribed to ‘News and views from the SESAR Deployment Manager’.
You will receive a verification email before you are added to our subscriber list.